Market coupling is the coupling of Ukraine's day-ahead market (DAM) and intraday market (IDM) with the European Union's Single Day-Ahead Coupling (SDAC) and Single Intraday Coupling (SIDC).
Since 2019, electricity trading on Ukraine's DAM and IDM has been conducted in accordance with European standards, with JSC “Market Operator” as the sole organiser.
Market coupling does not create new segments on the Ukrainian market, but involves harmonising the operational processes for trading on the coupled short-term segments of the electricity market.
Within the coupled DAM/IDM (SDAC/SIDC), electricity trading takes place both within a trading zone and between trading zones, in accordance with results calculated centrally using the relevant algorithms (EUPHEMIA/XBID).
Prices and traded volumes are determined taking into account cross-zonal flows for all coupled trading zones, in accordance with the implicit allocation of cross-border interconnection capacity.
With implicit capacity allocation, a market participant does not need to purchase or book the right to use a cross-border interconnection — capacity is allocated simultaneously with the electricity.
For market participants, the changes will be largely unnoticeable at the trading level: bids to buy and sell electricity are submitted within the existing DAM and IDM, while the available cross-zonal capacity for electricity flows within the coupled markets is determined by the transmission system operator (TSO).
In SDAC, the bids of Ukrainian and European participants and the available capacity are taken into account simultaneously by an algorithm that determines the prices and accepted volumes for each country separately (including exports and imports). In SIDC, market participants conclude trades, including with participants from other countries, in continuous trading mode, provided that capacity is available between the relevant zones.
Certain trading parameters will change for the Ukrainian market: trading time will be synchronised with CET, the operational standard will become a 15-minute settlement period, and the approaches to participants' financial security and credit risk management may also change.
The European market coupling model covers two segments of the electricity market: the day-ahead market and the intraday market.
SDAC has been coupling the day-ahead markets of European countries since 2014.
Trading takes the form of an auction, the results of which are used by the EUPHEMIA algorithm to simultaneously determine market prices and traded volumes taking cross-zonal flows into account.
All accepted bids within a trading zone are settled at a single price on a pay-as-cleared basis. Trading is conducted in a 15-minute settlement period. SDAC gate closure takes place at 12:00 CET on the day preceding delivery. The price limits are −ˆ600/MWh and +ˆ4,000/MWh.
Key steps of the process during the day preceding delivery (D-1):
SIDC couples the intraday markets of European countries and enables trading in two formats: continuous trading (since 2018) and intraday auctions (since 2024).
In continuous trading mode (SIDC Continuous Trading, SIDC CT), participants conclude trades, including with participants from other countries, throughout the trading session on a pay-as-bid basis. The XBID algorithm is used to match bids, and cross-zonal gates close no later than 30 minutes before delivery. Trading is conducted in a 15-minute settlement period. The price range is −ˆ9,999/MWh to +ˆ9,999/MWh. SIDC CT gates open at 15:00 CET on the day preceding delivery (D-1).
SIDC Continuous Trading operates on the basis of shared IT infrastructure comprising three main components:
Thanks to the SOB, a bid from a participant of one NEMO can be matched with a bid from another participant in the same trading zone or in a different trading zone, provided the necessary capacity is available.
Trades are concluded on a first-come-first-served basis: bids with the highest purchase price and the lowest sale price are executed first. Where bids from different trading zones are matched, this involves the implicit allocation of the relevant capacity.
Once a trade is concluded, the information is automatically transmitted to the Shipping Module, and the SOB and CMM are updated in real time, ensuring that current bids and available capacity are always displayed accurately.
Intraday auctions (SIDC Intraday Auctions, SIDC IDA) operate on auction-trading principles and a pay-as-cleared basis. The EUPHEMIA algorithm is used to determine the results, and cross-zonal gates close no later than 30 minutes before delivery. Like continuous trading, SIDC IDA uses a 15-minute settlement period. The price range is −ˆ9,999/MWh to +ˆ9,999/MWh.
Since the same cross-zonal capacity cannot be used for SIDC IDA and SIDC CT at the same time, cross-zonal trading in SIDC Continuous Trading is suspended for the duration of an IDA (±20 minutes). Continuous trading within a trading zone, however, may continue.
SIDC provides for three intraday auctions:
The development of the Single Day-Ahead Coupling (SDAC) began with separate regional initiatives to couple day-ahead markets.
In February 2014, North-Western Europe (NWE) Price Coupling was launched, coupling the markets of North-Western Europe. In parallel, the South-Western Europe (SWE) Price Coupling mechanism was operating, covering the countries of South-Western Europe. As early as May 2014, NWE and SWE were fully merged within Multi Regional Coupling (MRC). In November of the same year, 4M Market Coupling (4M MC) began operating separately, at that time coupling the Czech Republic, Hungary, Romania and Slovakia.
In subsequent years, MRC gradually expanded through the accession of new countries. In 2015, Italy and Slovenia were coupled; in 2018, Croatia joined MRC, and the Irish market also joined. Greece joined MRC in 2020. 4M MC also expanded in parallel, remaining a separate regional mechanism until 2021.
In May 2021, Bulgaria joined MRC, and in June 4M MC and MRC were merged into the Single Day-Ahead Coupling (SDAC).
The development of the Single Intraday Coupling (SIDC) began in 2018. The first wave of integration covered the countries of Western and Northern Europe and formed the basis for further scaling up to a single intraday market.
In November 2019, the countries of Central and South-Eastern Europe joined, namely Bulgaria, Croatia, the Czech Republic, Hungary, Poland, Romania and Slovenia, followed by Italy in September 2021.
In November 2022, the fourth wave of integration took place with the accession of Greece and Slovakia, completing the main stage of coupling the South-Eastern European countries into the Single Intraday Coupling (SIDC).
The purpose of market coupling is to make efficient use of cross-zonal capacity and thereby reduce price differences between trading zones, increasing market liquidity.
If two trading zones are not coupled, each operates as a separate market. The electricity price is determined solely by the balance of supply and demand within the respective trading zone.
For example, the price in Zone A is ˆ50/MWh, while in Zone B it is ˆ95/MWh. The absence of cross-zonal capacity for trading prevents the cheaper electricity from Zone A from flowing into Zone B.
Buyers in trading zone A pay ˆ200,000 for 4,000 MWh purchased, while buyers in trading zone B pay ˆ190,000 for 2,000 MWh.
Thus, in the absence of market coupling, the price difference between trading zones persists, and the opportunity to make use of cheaper electricity from a neighbouring trading zone is not realised.
Market coupling uses the cross-zonal capacity of cross-border interconnections, in particular, to allow electricity to flow from a trading zone with a lower price to a trading zone with a higher price, thereby equalising prices across the different trading zones.
For example, the available capacity between the trading zones is 1,000 MW, which is sufficient for full price convergence. As a result, the price in both zones is set at ˆ80/MWh — trading zone A exports 1,000 MWh of electricity to trading zone B, where the market price was high.
Buyers in trading zone A pay ˆ320,000, while buyers in zone B pay ˆ240,000 plus ˆ80,000 for the electricity imported from zone A.
As a result, market coupling ensures a single price across the trading zones, and cross-zonal capacity is used efficiently to move electricity to where it has a higher economic value.
If the available capacity is not sufficient for full price convergence, market coupling still ensures the maximum possible use of the available cross-border interconnection.
For example, if the capacity between the zones is only 500 MW, but a larger volume would be needed to equalise prices between the trading zones, the algorithm uses the entire available volume to transfer electricity from trading zone A to trading zone B. In this case, it is not possible to fully eliminate the price difference: the price in trading zone A is ˆ62/MWh, while in zone B it is ˆ87/MWh.
This means that trading zone B pays ˆ31,000 for the electricity imported from trading zone A, corresponding to the value of 500 MWh at zone A's price (ˆ62/MWh).
The difference between the prices in the two trading zones generates congestion income from the allocation of cross-zonal capacity:
(87 − 62) × 500 = ˆ12,500
This amount arises from the limited cross-zonal capacity and represents the economic value of the scarce interconnection. The corresponding amount is transferred to the Joint Allocation Office (JAO) — the company responsible for collecting congestion income and subsequently distributing it among transmission system operators.
Market coupling does not always eliminate the price difference between trading zones, but it makes the most efficient use of the available cross-zonal capacity.
The operation of market coupling is based on a multi-level system of European, regional and national rules that govern the organisation of trading, the allocation of cross-zonal capacity, the interaction between the nominated electricity market operator (NEMO) and TSOs, and the settlement process.
The basis of the market coupling legal framework is Regulation (EU) 2019/943 on the internal market for electricity. It establishes the general principles for the operation of an integrated electricity market, including requirements for the allocation of cross-zonal capacity and the organisation of trading on the DAM and IDM.
Other EU legal acts also play an important role, in particular Directive (EU) 2019/944, which sets out the general rules for the operation of the internal market for electricity and the rights and obligations of its participants.
The detailed operation of market coupling is set out in Commission Regulation (EU) 2015/1222 establishing a guideline on capacity allocation and congestion management (CACM), as well as in pan-European, regional and national terms, conditions and methodologies (TCM).
CACM defines, among other things, the principles governing the operation of the Single Day-Ahead Coupling (SDAC) and the Single Intraday Coupling (SIDC), the roles of NEMOs and TSOs, the procedure for allocating cross-zonal capacity, and the basic requirements for market coupling algorithms.
TCMs set out in detail how the individual market coupling processes are carried out in practice: capacity calculation and allocation, algorithm operation, data exchange, procedure definition, and so on.
Pan-European TCMs are developed by all NEMOs or all TSOs, and in certain cases jointly by NEMOs and TSOs. The participants jointly draft the document, agree on it in accordance with the established decision-making rules, and conduct consultations with stakeholders.
Once the consultations are complete, the final proposal is submitted for approval to the national regulatory authorities and/or the European Union Agency for the Cooperation of Energy Regulators (ACER), depending on the specific TCM. If the regulatory authorities are unable to reach a joint decision, the matter is referred to ACER, which takes the final decision.
Example: the methodology for the price coupling algorithm, the continuous trading matching algorithm, and the price coupling algorithm for the intraday auction (developed by the NEMOs and approved by ACER).
Regional TCMs are developed by the participants of the relevant region — mostly TSOs, or TSOs together with NEMOs.
Once a TCM has been developed, the proposal undergoes public consultation and is submitted for approval to the national regulatory authorities of the relevant region. The regulators must agree on a joint decision. If they fail to reach agreement within the established time limit, the decision is referred to ACER.
Example: the Core Capacity Calculation Methodology, which sets out how the TSOs of the CORE region calculate the volume of capacity that can be offered to the market (the methodology is based on a flow-based approach).
National TCMs are approved by the relevant national regulatory authority.
In the context of market coupling, one key example is the Multi-NEMO Arrangement (MNA) — a document required to organise market operation in a trading zone where more than one NEMO operates.
CACM explicitly provides for the development of such documents by TSOs in cooperation with the relevant NEMOs. The MNA proposal is submitted for approval to the relevant national regulatory authorities. The mechanism must be non-discriminatory and allow other NEMOs to join it.
The MNA sets out how several NEMOs in a single trading zone interact with one another and with TSOs to participate in SDAC and/or SIDC, including with regard to the allocation of cross-zonal capacity, the exchange of necessary data, and so on.
Example: the MNA for the DE/LU trading zone, approved by the German and Luxembourg regulators in 2018.
The practical implementation of market coupling also requires a contractual framework between the organisations performing the relevant functions to ensure the operation of SDAC/SIDC.
At the European and regional levels, multilateral cooperation agreements are concluded between NEMOs and TSOs, setting out the procedure for jointly carrying out the market coupling processes.
At the bilateral level, NEMOs and TSOs conclude corresponding agreements governing their interaction, information exchange, the performance of operational procedures and the parties' liability.
Each NEMO applies its own trading rules, which set out, among other things, the conditions for market participants' participation, the procedure for submitting and accepting bids, and for conducting trading and financial settlement.
Thus, market coupling is underpinned by a set of interconnected levels of regulation — from EU legislation to multilateral and bilateral agreements and NEMOs' trading rules.
The operation of market coupling relies on the interaction of three main participants: transmission system operators (TSOs), regional coordination centres (RCCs) and nominated electricity market operators (NEMOs). Each of them is responsible for a separate part of the process — from capacity management to the organisation of trading and the determination of results.
TSOs are responsible for the reliable and secure operation of the electricity system and provide the cross-zonal capacity necessary for market coupling.
In particular, TSOs:
RCCs ensure regional coordination of TSOs' work and support the processes necessary to determine available capacity and maintain the operational security of the electricity system at the regional level.
In the context of market coupling, RCCs, in particular:
RCCs provide the necessary coordination of the network-related part of the market coupling process.
The nominated electricity market operator (NEMO) organises trading on the day-ahead market and the intraday market, and interacts with market participants, other NEMOs and TSOs.
Within market coupling, a NEMO performs two interrelated roles.
First, it acts as the market operator through which participants submit bids and receive trading results.
Second, a NEMO may perform the function of Market Coupling Operator (MCO Function) — participating in the joint European process of calculating market coupling results, as well as in the use, maintenance and development of the market coupling algorithms together with other NEMOs.
A NEMO ensures equal and non-discriminatory conditions for participation in SDAC and SIDC, accepts bids from market participants and processes them in accordance with the established rules, and acts as the central counterparty once trading results have been determined.
An important function of a NEMO is to ensure the anonymity of bids. A market participant submits a bid to its own NEMO, and during market coupling this data is transmitted to the shared systems in anonymised form, i.e. without disclosing information about the specific participant.
A NEMO also informs market participants of the trading results — including prices, accepted volumes and the execution status of bids (each NEMO carries out its own portfolio management).
A NEMO also ensures the confidentiality of commercially sensitive information, provides the necessary data to regulatory authorities, and applies pan-European rules to organise market operation. In addition, NEMOs participate in the development of the regional and national rules necessary for the operation of SDAC and SIDC.